“Selectric” II Typewriter — Dual Pitch
Correcting “Selectric” II Typewriter
MECHANISM OPERATION AND ADJUSTMENTS
Backspace
Ribbon
SPECIAL MACHINE FEATURES
REMOVAL PROCEDURES
Carrier and Rocker Assembly Removal
Carrier Return/Backspace Cable Drum Assembly Removal — RB/S
Cycle Clutch and Cycle Shaft Removal
Escapement Rack Removal — Dual Pitch
Margin Rack & Rail — Dual Pitch
Operational Cam Follower Replacement
Operational Cam Follower Roller
Print Sleeve Removal (Correcting)
Print Sleeve Removal (Non-Correcting)
Rotate Selection Differential Removal
Tilt Ring and Rotate Shaft Removal
27-Tooth Ratchet Assembly Removal
54-Tooth Ratchet Assembly Installation